Restoration & Renovation Projects Roundup
Here is a sampling of some of the many restoration and renovation projects that have taken place in the last year – or are still in progress – throughout Colorado.
Arvada Center for the Performing Arts Expansion – Phase I
Arvada
$6.4 million
Architect: Fentress Bradburn
Contractor: Saunders Construction
Start: March 2006 Finish: Sept. 2006
Includes 20,000 sq ft of newly constructed space and 18,500 sq ft of interior renovations and improvements.
Baurs Historic Renovation
Denver
$3 million
Architect: ArchitectureDenver
Contractor: Centerre Construction Inc.
Start: Nov. 2005 Finish: Jan. 2006
Historic renovation of a landmark building to its early 20th century façade, with restoration and transformation of 30,000-sq-ft interior into full-floor loft spaces for retail, restaurant and office use.
Boettcher Mansion Capital Improvements
Golden
$3.1 million
Architect: SlaterPaull Architects
Contractor: TC2
Start: Jan. 2006 Finish: June 2007
Renovation of 1917 mansion, including upgrades to M/E systems, window and door restorations, stucco and tile work, kitchen upgrades, lobby remodel and period landscaping.
Broadmoor South Tower Renovation
Colorado Springs
$25.2 million
Architect: CSNA Architects
Contractor: M.A. Mortenson Co.
Start: Jan. 2005 Finish: May 2006
Extensive interior renovation that required building additional sq footage outside existing structure’s footprint.
Carson Middle School Renovations & Addition
Fort Carson
$15.8 million
Architect: Christiansen Reece & Partners PC
Contractor: Nunn Construction Inc.
Start: March 2005 Finish: Aug. 2006
Renovation and expansion of a 50-plus-year-old building, including 108,000 sq ft of new space and renovation of 29,000 sq ft.
City of Arvada Shops Expansion
Arvada
$4.6 million
Architect: Bennett Wagner & Grody Architects
Contractor: Pinkard Construction Co
Start: Oct. 2005 Finish: July 2006
Renovation and expansion of two-story, 32,000-sq-ft facility, including site development and complete interior remodel.
Crooks Palace Bar
Black Hawk
$2.8 million
Architect: PEH Architects
Contractor: White Construction Group
Start: Aug. 2005 Finish: July 2006
Included restoration of masonry, woodwork and painting of the building with a kitchen and dining room addition.
Fitzgerald’s Casino Historic Building
Black Hawk
$20 million
Architect: ICI Design Group
Contractor: Haselden Construction
Start: Oct. 2006 Finish: Jan. 2008
Includes preservation of the historic Rohling Inn, renovations and construction of a two-story, 22,700-sq-ft addition on a vacant lot adjacent to the existing property.
Koelbel Hall CU Leeds School of Business Addition & Renovation
Boulder
$38 million
Architect: Davis Partnership, ARC/Architectural Resources
Contractor: Pinkard Construction Co.
Start: May 2006 Finish: Summer 2007
Includes 50,000-sq-ft renovation, 63,150-sq-ft structural steel and stone veneer addition and significant site upgrades to greenbelt on the west side of the site.
Manzanola Train Depot Manzanola
$1 million
Architect: Marc Diament Architecture
Contractor: White Construction Group
Start: Fall 2006 Finish: Spring 2007
Restoration and renovation of 1913 Mission Revival-inspired train depot to house the city’s police station, town hall, senior center and a museum.
North High School
Denver
$4.5 million
Architects: Humphries Poli Architects PC (exterior), klipp (cafeteria)
Contractor: White Construction Group
Start: Feb. 2006 Finish: Sept. 2006
Historic exterior renovation of masonry, metals cornice; roofing repairs and window replacement; plus renovation of cafeteria.
Ogden Theater
Denver
$280,000
Architect: Architectural Workshop
Contractor: Lathram Construction
Start: Jan. 2006 Finish: Feb. 2006
Renovation and expansion of the 88-year-old theater, including multiple upgrades to increase capacity, enlarge stage area and improve lighting, sound and life-safety systems.
Park Avenue – Hope VI
Denver
$14.6 million
Architect: Humphries Poli Architects PC
Contractor: Milender White Construction Co.
Start: Oct. 2005 Finish: Oct. 2006
A 124-unit affordable housing complex that features a four-story wood frame building atop a concrete parking structure.
Park Hyatt at Beaver Creek
Beaver Creek Village
$26 million
Architect: Hornberger+Worstell
Contractor: GE Johnson Construction Co.
Start: Spring 2006 Finish: XXX
Includes interior room and spa renovations, relocation of the electrical room and the addition of air conditioning to all guest rooms.
Rolling Pins Barracks Renovation
Fort Carson
$74.5 million
Owner: Fort Carson Directorate of Contracting
Architect: Department of Public Works – Fort Carson
Contractor: JKT Development Inc. and Torix General Contractors, a joint venture
Start: March 2005 Finish: May 2006
Scope: LEED-compliant renovation of 14 barracks, including extensive site and utility work; construction of new standing seam metal roof; exterior walkways; upgraded M/E and HVAC systems.
Susan M. Duncan Family YMCA
Arvada
$6 million
Architect: RNL Design
Contractor: M.A. Mortenson Co.
Start: April 2005 Finish: April 2006
Renovation project that included the gutting and reconfiguring of more than 80% of the existing 57,500-sq-ft facility and remodeling the remaining 20&.
Telluride Mountain School
Telluride
$1.45 million
Architect: Ewers Architecture
Contractor: Fortenberry Construction
Start: Feb. 2006 Finish: Aug. 2006
Transformation of historic building into a school for preschool through 12th grade, with a project emphasis on sustainable design.
Transit Center at CSU’s Lory Student Center – Phase II
Fort Collins
$4.4 million
Architect: Coover-Clark & Associates PC
Contractor: Mark Young Construction Inc.
Start: October 2005 Finish: August 2006
Renovation of the student center’s north entrance that adds 14,458 sq ft of new space and renovation of 7,749 sq ft of existing space. LEED-gold or silver certification will be sought.
Click here for