1. Four Seasons Hotel and Private Residences Denver
Denver
$155 million
Owner: 1111 Tower LLC
General Contractor: Swinerton Builders
Architect: Carney Architects; HKS Inc
Start: July 2007 Finish: August 2009
A 44-story hotel, including two levels of below-grade parking, that will feature a spa, restaurant and meeting rooms and 102 for-sale residences on the upper floors. |
2. Snowmass Viceroy Hotel
Snowmass
$130 million
Owner: Related/Westpac
General Contractor: PCL Construction Services Inc
Architect: OZ Architecture
Engineer: Monroe & Newell Engineers Inc
Start: May 2007 Finish: 2009
Snowmass Base Village Buildings 13A & 13B, an eight-story hotel. |
3. The Spire
Denver
$120 million
Owner: Spire Denver LLC
General Contractor: JE Dunn Construction Co.
Architect: RNL Design
Engineers: ABS Consultants Inc; Jirsa Hedrick & Associates Inc; Vision Land Consultants Inc
Start: June 2007 Finish: July 2009
A 42-story, 950,000-sq-ft, mixed-use building that will include an eight-level parking structure, first-floor retail space and 504 residential units. |
4. One Steamboat Place
Steamboat Springs
$115 million
Owner: Timbers Co
General Contractor: Haselden Construction LLC
Architects: RNL Design; Cottle Carr Yaw Architects
Engineers: RNL Design, The RMH Group
Start: Summer 2007 Finish: 2009
A 440,000-sq-ft, mixed use project that includes a two-level parking garage under a public plaza, retail at the plaza level and 80 high-end residential units. |
5. Capella Telluride
Telluride
$105 million
Owner: RAL Companies & Affiliates LLC
General Contractor: Shaw Construction
Architect: Ivins Design Group
Engineers: Martin/Martin Inc; McGlamery Structural
Start: February 2007 Finish: January 2009
Approx. 400,000-sq-ft, 148-unit, ski-in/ski-out hotel and residential property with a spa, pool, fitness center, multiple restaurants, climate-controlled parking, kid's club and retail facilities. |
6. Colorado State Penitentiary II High-Custody Expansion
Cañon City
$102 million
Owner: Colorado Department of Corrections
General Contractor: TBD
Architect: CSNA Architects
Engineers: Martin/Martin Civil Engineers & Surveyors; SA Miro Inc; The RMH Group Inc
Start: June 2007 Finish: October 2009
Expansion includes 960 high-custody beds, administrative space for a combined three-prison complex and support space for 1,284 inmates. |
7. Kent Place
Englewood
$100 million
Owner: Continuum Partners
General Contractor: GE Johnson Construction Co
Architect: David Owen Tryba Architects
Engineers: ABS Consultants Inc; Jirsa Hedrick & Associates Inc
Start: May 2007 Finish: January 2009
Mixed-use project that consists of two residential towers, retail space and underground parking. |
8. Denver Justice Center Courthouse
Denver
$99.1 million
Owner: City and County of Denver
General Contractor: Hensel Phelps Construction Co
Architects: klipp; Ricci Green Associates; Harold Massop Associates Architects PC
Engineers: Harris-Kocher Smith; Nadji & Associates; SA Miro Inc; Shen Milsom & Wilke Inc; studioINSITE LLC; Ambient Energy; Sorcar Engineering Inc
Start: July 2007 Finish: December 2009
Courthouse for the Denver Justice Center. |
9. Classic Residence by Hyatt in Highlands Ranch
Highlands Ranch
$97 million
Owner: Classic Residence by Hyatt
General Contractor: Saunders Construction Inc
Architect: Solomon Cordwell Buenz
Engineers: CTC-Geotek; Martin/Martin Inc; M-E Engineers Inc; SFA Design
Start: January 2007 Finish: October 2008
A 24-acre “life-care” community that includes a 464,000-sq-ft independent living facility, 42,000-sq-ft, three-story care center, 38 private villas, walking trails, fitness center and indoor swimming pool. |
10. 1515 Wynkoop
Denver
$90 million
Owner: Hines
General Contractor: Holder Construction
Architects: Hartman-Cox Architects, Gensler; Norris Design
Engineers: M-E Engineers Inc, Jirsa Hedrick & Associates
Start: March 2007 Finish: September 2008
An approximately 134,000-sq-ft, four-story, below-grade concrete parking garage topped by an eight-story, 185,000-sq-ft office building with glass, brick and precast concrete veneer. Pre-certified LEED silver. |
11. Adams 14 High School and Community College Complex
Commerce City
$57.2 million
Owner: Adams 14 School District
General Contractor: Adolfson & Peterson Construction
Architect: H + L Architecture
Engineers: Lund & Associates; Structural Consultants Inc; DL Adams Associates Inc; ME Group; Structural Consultants Inc; Tetra Tech Inc
Start: June 2007 Finish: July 2009
A 300,000-sq-ft design-build high school. Highlights include swimming pool, science labs, gymnasiums and track and field. |
12. Denver Health and Hospital Cafeteria, Kitchen and First Floor Remodel
Denver
$42 million
Owner: Denver Health and Hospital Authority
General Contractor: Gerald H Phipps Inc
Architects: Boulder Associates Inc; Bennett Wagner & Grody Architects
Engineers: Cator Ruma & Associates; Martin/Martin Inc; Szynskie Group
Start: January 2007 Finish: April 2010
Complete phased renovation of existing hospital's cafeteria, kitchen and main floor and two-story addition over hospital loading dock. |
13. Douglas County High School No. 9
Parker
$41 million
Owner: Douglas County School District
General Contractor: JHL Constructors Inc
Architect: H + L Architecture; LKA Partners Inc
Engineers: Consulting Engineer; HCDA Engineering Inc; JVA Inc; Smith Seckman Reid Inc
Start: January 2007 Finish: October 2008
A 259,000-sq-ft building supported by drilled piers and grade beams and featuring a steel and structural block with a brick veneer. Highlights include a theater, gymnasiums, track and field facilities, sports fields and exposed mechanical and electrical systems in various areas. |
14. University of Colorado Visual Arts Complex
Boulder
$40 million
Owner: University of Colorado at Boulder
General Contractor: MA Mortenson Co
Architects: Kallmann McKinnel & Wood Architects; OZ Architecture
Engineers: SA Miro Inc; Scott Cox & Associates Inc
Start: December 2007 Finish: 2008
A 148,000-gross-sq-ft complex featuring climate-controlled exhibition and storage spaces, galleries, a 200-seat auditorium, collection study and educational workshop. |
15. Holly Creek Christian Living Communities–Phase 2
Centennial
$33.5 million
Owner: Christian Living Communities Management Services Inc
General Contractor: Pinkard Construction Co
Architects: RNL Design; The Brickman Group
Engineers: Gordon Gumeson and Associates Inc; Jirsa Hedrick & Associates Inc; Pallasen Engineering; Smith Seckman Reid Inc; Terracon Consultants Inc
Start: February 2007 Finish: October 2008
A 130-unit senior living facility with a 16,000-sq-ft, below-grade parking structure and vaulted, one-story common gallery. |
16. Brigade & Battalion Headquarters
Fort Carson
$31.2 million
Owner: US Army Corps of Engineers
General Contractor: Hensel Phelps Construction Co
Architect: RNL Design
Engineer: The RMH Group
Start: January 2007 Finish: March 2008
Design-build construction of a 144,000-sq-ft facility consisting of NOC, BOC, SCIF, offices and classrooms. |
17. Exempla Lutheran Medical Center–Northeast Renovation
Wheat Ridge
$30 million
Owner: Exempla Healthcare
General Contractor: MA Mortenson Co
Architect: H + L Architecture
Engineer: Cator Ruma & Associates
Start: April 2007 Finish: August 2010
A multi-phased remodel/renovation and 250,000-sq-ft tower addition. |
18. (tie) Crystal Peak Lodge
Breckenridge
$29 million
Owner: Vail Resorts Development Corp
General Contractor: Hyder Construction Inc
Architect: O'Bryan Partnership Inc
Engineers: FD Taylor Electric Construction Co; MKK Consulting Engineers Inc; Monroe & Newell Engineers Inc
Start: April 2007 Finish: August 2008
Construction of a 115,000-sq-ft, 46-unit lodge at the base of Peak 7 at Breckenridge Ski Resort. |
18. (tie) Falcon School District High School No. 3
Colorado Springs
$29 million
Owner: Falcon School District No. 49
General Contractor: Nunn Construction Inc
Architect: LKA Partners Inc
Start: April 2007 Finish: August 2008
A 160,000-sq-ft high school. |
20. Interstate 70 and SH 58 Interchange Project
Wheat Ridge
$25.7 million
Owner: Colorado Department of Transportation
General Contractor: Ames Construction Inc
Engineer: Colorado Department of Transportation
Start: February 2007 Finish: December 2008
Interchange improvement project at I-70 and S.H. 58 that includes construction of two new ramps and reconstructing/realigning three other ramps. |
21. Powers Office Park
Colorado Springs
$23 million
Owner: Powers Office Park LLC
General Contractor: Bryan Construction Inc
Architect: James W Nakai & Associates PC
Engineer: Classic Engineering
Start: June 2007 Finish: November 2008
First phase of the 190,000-sq-ft project includes six three-story buildings with covered parking. |
22. Adams 14 Schools
Commerce City
$22.5 million
Owner: Adams 14 School District
General Contractor: The Neenan Co
Architects: The Neenan Co; RB+B Architects Inc
Engineer: H. Gary Howell, PE
Start: April 2007 Finish: August 2008
Additions and HVAC renovations to nine schools. |
23. Mountain West Business Park
Denver
$15 million
Owner: Mountain West Industrial Properties
General Contractor: dcb Construction Co Inc
Architect: Ware Malcomb
Engineers: Peak Engineering; R & R Engineering-Surveyors Inc
Start: April 2007 Finish: February 2008
A 300,000-sq-ft office/warehouse distribution center that includes 10 single-story, sitecast tilt-up buildings. |
24. Douglas County Building Complex/Downtown Castle Rock Campus
Castle Rock
$15 million
Owner: Douglas County
General Contractor: Rocky Mountain Prestress
Architects: Pahl Architecture PC; Norris Design
Engineers: eng 3 group; LEED-BYG; Martin & Martin Civil Engineers & Surveyors; Monroe & Newell Engineers Inc; Rider Hunt Levett & Bailey Ltd
Start: 2007 Finish: September 2008
A 60,000-sq-ft addition connected by a four-story atrium to existing Miller Building. Other highlights include a 374-car, four-story parking garage. Project will be LEED silver or gold certified. |
25. New Castle Middle School
New Castle
$14.85 million
Owner: Garfield School District RE-2
General Contractor: FCI Constructors Inc.
Architect: Van Tilburg Banvard & Soderbergh AIA
Engineers: Boundries Unlimited; DMCE Engineering; Fanning/Howey Associates
Start: July 2007 Finish: August 2008
A 76,000-sq-ft, steel-and-masonry structure with a two-story academic wing. Houses 750 students. |
26. The Medical Office Pavilions at Briargate
Colorado Springs
$14.1 million
Owner: Prime West Development Inc
General Contractor: DSP Builders Inc
Architect: Intergroup Architects
Engineer: Classic Consulting Engineers
Start: March 2007 Finish: April 2008
Medical office complex that consists of 2 three-story, tilt-up concrete buildings totaling 169,050 sq ft. Also includes core/shell and lobby/restroom/corridor and leasing office tenant finish construction of two EA sitecast concrete, three-story, tilt-up buildings totaling 168,543 sq ft. |
27. Colorado Bureau of Investigation
Grand Junction
$11.83 million
Owner: Colorado Bureau of Investigation
General Contractor: FCI Constructors Inc
Architect: Blythe Design Co.
Engineer: Bighorn Consulting Engineer; Lindauer-Dunn; Rolland Engineering
Start: January 2007 Finish: March 2008
Design-build of a 37,000-sq-ft forensics laboratory and investigative offices. |
28. Northcare at St. Francis Medical Center
Colorado Springs
$11 million
Owner: Northcare
General Contractor: Colarelli Construction
Architect: RTA Architects
Engineer: Kiowa Engineering Corp; Plant Engineering Consultants; Sol Chavez
Start: July 2007 Finish: August 2008
Four-story, 84,000-sq-ft medical office building linked via sky bridge to St. Francis Medical Center. |
29. Computer Science Building at Colorado State University
Fort Collins
$10.5 million
Owner: Colorado State University
General Contractor: NEED THIS INFO
Architect: Anderson Mason Dale Architects
Engineer: Beaudin Ganze Consulting Engineers Inc; SA Miro Inc
Start: July 2007 Finish: July 2008
Computer labs and offices, including dedicated space for the university’s new Information Systems Technology Center. Highlights include a lounge, plaza and tower. |
30. The Sundial House at Back Country
Highlands Ranch
$10.4 million
Owner: Shea Homes
General Contractor: Fransen Pittman General Contractors
Architect: 4240 Architecture Inc
Engineer: M-Tech
Start: September 2007 Finish: June 2008
Club house for residential development. Highlights include open-air courtyard, cafÈ, meeting space, fitness area, hot tub and swimming, lap and recreational pools. |
31. Carter Lake Dam No 1-Outlet Works Addition
Larimer County
$9.8 million
Owner: Northern Colorado Water Conservancy District
General Contractor: SEMA Construction Inc
Architect:
Engineer: URS Corp
Start: March 2007 Finish: June 2008
A six-ft-diameter outlet conduit at the right abutment of the existing Carter Lake Dam No. 1. Primary features include a 123-ft intake tower and prefabricated steel truss access bridge, 780-ft-long tunnel with a welded steel liner encased in concrete, downstream conduit, new flow meter vault, a valve structure and access roads. |
32. Infinity Park at the Village of Glendale
Glendale
$9.5 million
Owner: City of Glendale
General Contractor: Turner Construction Co
Architect: Ohlson Lavoie Collaborative
Engineer: NEED TO ADD THESE
Start: March 2007 Finish: June 2008
Rugby field, all-events stadium and sports center. |
33 (tie). Springhill Suites Denver
Denver
$8 million
Owner: Summit Hotel Properties
General Contractor: Alliance Construction Solutions LLC
Architect: Mind's Eye Architects
Engineer: Optima Engineering Structures Inc
Start: January 2007 Finish: December 2007
Four-story hotel with 124 units. Highlights include business center conference room, fitness center, pool, restaurant and bar. |
33 (tie). American Honda Data Facility
Longmont
$8 million
Owner: North American Honda Motor Company Inc
General Contractor: Saunders Construction Inc
Architect: The Crosby Group Inc PC
Engineer: Swanson Rink Inc
Start: January 2007 Finish: December 2007
A 67,000-sq-ft data storage building. Highlights include two 3,000-kva utility transformers, two 5,000-amp main switchboards, two megawatt emergency back-up generators in parallel, two UPS systems and a redundant PDV power supply for each computer within the building. |
35. Target Store No. T-2343
Montrose
$7.4 million
Owner: Target Stores
General Contractor: Roche Constructors Inc
Architect: RSP Architects Ltd
Engineer: Erichsen Roed & Associates; Gausman & Moore
Start: January 2007 Finish: September 2007
Construction of a 127,630-sq-ft store. |
36. Longmont Humane Society
Longmont
$7.2 million
Owner: Longmont Humane Society
General Contractor: Golden Triangle Construction
Architect: Animal Arts/Gates Hafen Cochrane
Engineer: JVA Inc
Start: April 2007 Finish: December 2007
A 43,280-sq-ft renovation and addition to existing facility, including associated site development. |
37. Courtyards at Briargate
Colorado Springs
$6.5 million
Owner: RDB Development
General Contractor: White Construction Group
Architect: PWN Architects & Planners Inc
Engineer: Boulder Engineering Company; Classic Consulting and Engineering; Commercial Design Engineering
Start: January 2007 Finish: December 2007
Fourteen medical office buildings and site work on seven-acre site. |
38. St Francis Medical Center
Colorado Springs
$5.3 million
Owner: St Francis Medical Center
General Contractor: GE Johnson Construction Co
Architect: RTA Architects
Engineer:
Start: January 2007 Finish: February 2008
A 350,000-sq-ft hospital that includes 158 patient beds. ISEC's work included divisions 6100-Rough Carpentry, 6410-Custom Casework, 10200-Toilet Compartments, 10215-Cubicle Track, 10260-Wall Protection, 10800-Toilet Accessories, 10520-Metal Lockers, 10440-Fire Protection Equipment and division 12360-Solid Surface. |
39. Stapleton-RE/MAX Office Building
Denver
$4.2 million
Owner: Central Park Partners
General Contractor: Mark Young Construction Inc
Architect: Allred & Associates
Engineer: Ammex Masonry; EFT Electric; Horizon Glass Co; MK Roofing; Southern Trades; Total Plumbing Inc
Start: January 2007 Finish: June 2007
Core-and-shell construction of 40,000-sq-ft building with tenant finish work to follow, plus site work, paving and landscaping. |
40. AC-22 Data Center Expansion
Longmont
$3.5 million
Owner: Amgen
General Contractor: Howell Construction
Architect: BurkettDesign Inc
Engineer:
Start:
An expansion of data center infrastructure capacity to 100 watts/sq-ft power and cooling. Includes a building addition for physical storage of UPS modules and correction of various existing deficiencies. |
41. Pauline Memorial Catholic School
Colorado Springs
$3.1 million
Owner: Pauline Memorial Catholic School
General Contractor: Art C. Klein Construction
Architect: Cliff Taylor Architects
Engineer: ME&E Engineering Inc
Start: March 2007 Finish: October 2007
New classroom addition and gymnasium |
42 (tie). Walgreens
Greeley
$2 million
Owner: Edgemark Development Services
General Contractor: Waner Construction Co Inc
Architect: Studio DH
Engineer: Monroe & Newell Engineers Inc; Perception Design Group
Start: February 2007 Finish: August 2007
Two-story, 15,000-sq-ft, structural masonry building with an exterior veneer of structural brick, Aristcraft stone and steel awnings with concrete tile roofs. |
42 (tie). Bayshore Colorado on the Water Recreation Center
Weld County
$2 million
Owner: Carma Developmers LP
General Contractor: Waner Construction Co Inc
Architect: DTJ Design Inc
Engineer: Carroll & Lange Inc; JVA Inc; The Boulder Engineering Co
Start: July 2007 Finish: TBD
A 10,000-sq-ft private recreation center that includes a main building, meeting house, pool restroom and mechanical equipment buildings and a sailboat house. |
44. St Michael's Town Square Retail #4
Greeley
$2.2 million
Owner: Meyer Farm Development Inc
General Contractor: Heath Construction
Architect: Thorp Associates PC Architects & Planners
Engineer: Mep Engineering; Site Design LLC; SRB Consulting Engineers LLC; Weeks & Associates
Start: May 2007 Finish: November 2007
Retail, restaurant and offices are being provided in this 23,300-sq-ft, two-story building designed to house retail, restaurant and office space. |
45. Fairacres Manor Remodel/Addition
Greeley
$1.9 million
Owner: Suffolk Management
General Contractor: LBA Construction Services
Architect: Lantz-Boggio Architects PC
Engineer: AE Associates Inc; Tennison
Start: April 2007 Finish: November 2007
Resident room additions and remodel of existing resident office and common areas, including dining and living rooms and upgrades of existing finishes and some exterior site work. |
46 (tie). Jamaica Elementary School HVAC Upgrades
Aurora
$1.6 million
Owner: Aurora Public Schools
General Contractor: MW GOLDEN CONSTRUCTORS
Architect: SlaterPaull Architects
Engineer: Alber Engineering Inc; Anderson & Hastings; The Ballard Group
Start: February 2007 Finish: May 2007
Includes new plumbing and fixtures, ceilings throughout building, HVAC system; wall removal; installation of six new exterior doors and drywall soffits in all classrooms; masonry repairs to the structural glazed tile walls, exterior precast window sills and interior terrazzo window sills. |
46 (tie). S.H. 50 & S.H. 109 Bridge Repairs
Otero and Prowers counties
$1.6 million
Owner: Colorado Department of Transportation
General Contractor: Flatiron Constructors Inc Inter Mountain Division
Architect:
Engineer: Colorado Department of Transportation
Start: March 2007 Finish: July 2007
Repair or replacement of damaged portions of structures, which includes providing temporary support, planning, HMA overlay, bridge expansion and bearing devices, concrete bridge rail, traffic control and striping. |
48. Foothills Treatment Plant Chlorine Contact Basin and Chemical Improvements
Littleton
1.2 million
Owner: Denver Water
General Contractor: Garney Construction
Architect:
Engineer: Bates Engineering Inc
Start: January 2007 Finish: June 2008
Chemical improvements portion will include upgrading some of the plant’s chemical feed systems, including a new storage silo. Different bid packages include mobilization and relocation of an existing warehouse, excavation and underslab piping, and installation of concrete for the CCB.
|