1. Arrabelle @ Vail Square
Vail
$175 million
Owner: Vail Resorts
General Contractor: Shaw Construction
Architect: 4240 Architecture
Engineers: Monroe & Newell, Alpine Engineering
Start: Spring 2005 Finish: Aug. 2008
This is a new four-star, 36-room Rock Resorts Hotel with 71 condominiums and penthouses ranging from 1,500 sq ft to 8,000 sq ft and luxury residences ranging from 1,500 to 3,600 sq ft. The project includes a new town square, dining and shopping, a seasonal ice skating rink and spa facilities as well as centralized loading and parking. |
2.Snowmass Base Village, Phase I
Snowmass Village
$165 million
Owner: Related WestPac
General Contractor: The Weitz Co.
Architects: CCY Architects, OZ Architecture, 4240 Architecture
Engineers: Read Jones Christoffersen, Beaudin Ganze Consulting Engineers, Tetra Tech Inc.
Start: April 2005 Finish: Aug. 2008
This new development includes a 25,000-sq-ft children’s center, 15,000 sq ft of conference space and 64,000 sq ft of new shops, pubs and restaurants all connected to the upper village by the new Sky Cab. |
3. Vail’s Front Door
Vail
$115 million
Owner: Vail Resorts Development Co.
General Contractor: Hyder Construction Inc.
Architect: 4240 Architecture
Start: May 2006 Finish: Summer 2008
The 300,000-sq-ft redevelopment for Vail Resorts Development Co. is located on 11 acres at the base of the Vista Bahn Chair Lift. The project consists of 13 exclusive townhomes at the Lodge at Vail Chalets, a 26,000-sq-ft Skier Services building, the new Vail Mountain Ski Club and a new spa for the Lodge at Vail. A 200-space, three-level underground parking structure is being built beneath the project. |
4. The Penthouses at Manor Vail
Vail
$82.3 million
Owner: East West Partners
General Contractor: GE Johnson Construction Co.
Architect: Zeheren & Associates
Engineers: Beaudin-Ganze Consulting Engineers, Monroe & Newell, Intermountain Engineering
Start: June 2008 Finish: Oct. 2008
This project includes construction of 17 high-level-finish condo units at 3,500 and 5,000 sq ft and a new two-story, 151-space, precast parking garage built beneath the courtyard. |
5. Residences at Little Nell
Aspen
$70 million
Owner: Rep-Steeplechase Partners
General Contractor: Swinerton Builders
Architect: Poss Architecture & Planning
Engineer: KL+A Inc.
Start: March 2005 Finish: Fall 2008
This project consists of new construction of a 170,000-sq-ft building featuring 24 fractional ownership units and commercial space at the base of Aspen Mountain. |
6. Winter Park Village
Fraser Crossing & Founders Pointe
Winter Park
$43.5 million
Owner: Intrawest Placemaking
General Contractor: Milender White Construction Co.
Architect: OZ Architecture
Engineer: Monroe & Newell
Start: April 2006 Finish: Feb. 2008
The two condo buildings consist of 200 individually owned units at the base of Winter Park Ski Resort, plus 207 condos and attached retail space. |
7.Vail’s Mountain View Resources
Vail
$38 million
Owner: Lunar Vail
General Contractor: R.A Nelson & Associates Inc.
Architect: Resort Design Assoc. Intl.
Engineers: Monroe & Newell, Belfay, Peak Land Consultants
Start: March 2007 Finish: Dec. 2008
This project consists of 24 custom units, one-level parking plaza and three-level underground parking. |
8. The Villages
Steamboat Springs
$35 million
Owner: Trendwest Resorts Inc.
General Contractor: Drahota Development Co. LLC
Architect: AnKrom Mosian
Start: Oct. 2006
Finish: Dec. 2008
This project consists of a multifamily, time-share resort with 4 three-story residential buildings that include 142 units totaling 159,000 sq ft. |
9. The Village Core at Winter Park
Winter Park
$26.8 million
Owner: Intrawest Placemaking
General Contractor: Milender White Construction Co.
Architect: OZ Architecture
Engineer: Monroe & Newell
Start: April 2007
Finish: Dec. 2008
The Village Core at Winter Park is located on the slope side of the Winter Park Ski Resort and consists of high-end condos, retail space and a 286-space parking structure. |
10. The Willows
Vail
$24 million
Owner: Triumph Development
General Contractor: R.A. Nelson
& Associates Inc.
Architect: Resort Design Assoc. International
Engineer: KL+A Inc.
Start: May 2007
Finish: Nov. 2008
This project includes nine luxury, wholly owned residences and a small contingent of fractional condos. |
11.Base Camp One
Granby
$17.5 million
Owner: Dundee Base Camp LLC
General Contractor: TCD Inc.
Architect: OZ Architecture
Engineer: Redwine Engineers
Start: Sept. 2007 Finish: Dec. 2008
This 110,000-sq-ft project includes 64 high-end, ski-in/ski-out condos at base of Granby Mountain and a 22,000-sq-ft parking structure. |
12.AlpenGlow
Steamboat Springs
$10 million
Owner: Alpenglow Nominee LLC
General Contractor: Drahota Development Co. LLC
Architect: Vaught Frye Architects
Start: Nov. 2007 Finish: May 2008
This 26,882-sq-ft, mixed-use project includes the demolition of an existing motel and associated hardscape for the new construction of 6 two-story townhomes with walkout basements and a parking structure. |
13.Union Creek Townhomes
Copper Mountain
$8.6 million
Owner: Intrawest
General Contractor: TCD Inc.
Architect: Baker Hogan Houx
Engineer: Neujahr Gorman
Start: Sept. 2006 Finish: May 2008
This 68,000-sq-ft project includes eight buildings totaling 39 living units with exterior timber and stone accents. |
14.The Tavern Tech Center
Greenwood Village
$4.2 million
Owner: Tavern Hospitality Group
General Contractor: Catamount Constructors Inc.
Architect: Semple Brown Design
Engineers: McGlamery Structural Group Inc., Arrow Civil Engineers
This new 9,000-sq-ft, two-story restaurant includes 7,800 sq ft of parking. The interior features timber-and-wood construction, high-level architectural features and finishes that highlight the owner’s branding. Exterior construction includes the complex mix of four different finishes, including natural stone veneer. |