Top Projects: Health Care/Assisted Living
|
1. Holly Creek Retirement Community
Centennial
$58.6 million
Owner: Christian Living Communities
General Contractor: Pinkard Construction Co.
Architect: RNL
Engineers: Jirsa-Hedrick & Associates Inc., Pallasen Engineering, Smith Seckman Reid Inc., Terracon
Among the Subcontractors: AMI Mechanical, Design Electrical Contractors, Code Fire Systems
Start: March 2004 Finish: Feb. 2009
This two-phased, resort-style retirement community includes 262 apartment homes, numerous memory-care and skilled-nursing units, and a town center comprised of a movie theater, gift shop, wellness complex and three restaurants. |
2. Medical Center of Aurora
Patient Tower & Parking Structure
Aurora
$51.9 million
Owner: HealthONE Hospital Corp. of America
General Contractor: JE Dunn Construction Co.
Architect: Perkins and Will
Engineers: CCRD Partners, TRC International
Among the Subcontractors: Stresscon, Kenny Electric, RK Mechanical, CFFI, Zimmerman, Ludvik Electric
Start: Feb. 2007 Finish: April 2009
This project consists of a new 128,351-sq-ft, private patient tower and entry lobby. The patient tower consists of a four-level nursing component totaling 72 beds and connects to the existing hospital. The project also includes a new four-story parking structure for approximately 539 cars. |
|
3. Sunrise at Broomfield
Broomfield
$43 million
Owner: Sunrise Senior Living
General Contractor: Brinkmann Constructors
Architect: BeeryRio Architects
Engineers: Martin/Martin Inc., S3E Klingemann Inc.
Among the Subcontractors: Duro Electric, Alpine Design Interiors Inc., Denver Drywall Co.
Start: Sept. 2007 Finish: March 2009
The Sunrise at Broomfield is a 267,577-sq-ft independent- and assisted-living facility comprised of three main structures: a cast-in-place concrete parking garage; atop the parking garage is a four-story, 137,864-sq-ft, wood-framed area that holds 130 independent-living units; and the three-story, 75,549-sq-ft, steel-framed assisted-living residences. |
4. Poudre Valley Health Systems Medical Office Building,
Parking Structure & Pedestrian Bridges
Fort Collins
$20.9 million
Owner: Poudre Valley Health Systems, McWhinney
General Contractor: Swinerton Builders
Architects: Boulder Associates, Davis Partnership
Engineers: JVA Inc., Northern Engineering, SCI Structural, Smith Seckman Reid Inc., MEP Engineers
Among the Subcontractors: AMMEX Masonry, Boulder Steel, Commercial Glass, Douglass Roofing, Gregory Electric, RK Mechanical
Start: April 2008 Finish: April 2009 |
5. Sky Ridge Medical Center
OR Expansion
Lone Tree
$19.8 million
Owner: HCA, HealthONE LLC
General Contractor: Bovis Lend Lease Inc.
Architect: Gresham, Smith and Partners
Engineers: Gresham, Smith and Partners
Start: Jan. 2008 Finish: June 2009
This project includes six additional operating rooms with adjoining services, a pharmacy addition and renovation, a new holding area and a sub-sterile addition and renovation. |
|