Top Projects: Industrial/Manufacturing
1. Lehman Printing Center
Berthoud
$8.2 million
Owner: Lehman
Communications Corp.
General Contractor: Golden Triangle Construction
Architect: Robert G.
Dashiell Jr. Inc.
Start: April 2008
Finish: Feb. 2009
This project consists of new construction of a two-story, 62,812-sq-ft printing center. |
|
2. Pro Build
Grand Junction
$4.4 million
Owner: Pro Build
General Contractor: Extreme Construction Co.
Architect: Carl Vosatek
Engineers: Bighorn Consulting Engineers
Among the Subcontractors: Redlands Electric, Haining Refrigeration
Start: Oct. 08 Finish: May 09
This project consists of a 41,400-sq-ft office, showroom and warehouse, along with a 7,200-sq-ft saw shop to cut custom lumber orders and a 3,600-sq-ft storage shed to store all the material to accommodate Pro Build’s acquisition of Home Lumber. |
3. Patterson Drilling
Grand Junction
$4.1 million
Owner: Patterson Drilling
General Contractor: Extreme Construction Co.
Architect: J.R. Fillerup
Engineers: Vortex Engineering
Among the Subcontractors: Redlands Electric, GMMI
Start: Feb. 2008
Finish: Jan. 2009
This project consists of an 18,000-sq-ft office and shop along with a 3,386-sq-ft enclosed wash bay with 12 acres of sitework. |
4. Sunset Stone Warehouse Expansion
Castle Rock
$3.1 million
Owner: Sunset Stone Inc.
General Contractor: Waner Construction Co. Inc.
Architect: Studio DH
Engineers: Perception Design Group Inc., DW Norman Inc.
Among the Subcontractors: Keefe Construction, Dig-More
Start: Dec. 2008 Finish: June 2009
This project expansion adds approximately 45,000 sq ft to the existing manufacturing facility. The design-build project utilizes a metal building structure accentuated by Sunset Stone veneer on the exterior. |
|