Features
 Current Features
 Past Features





Cover Story - June 2009

Top Projects: Water & Wastewater

Lone Tree Creek Water Reuse Facility

1. Lone Tree Creek Water Reuse Facility
Centennial
$30 million
Owner: Arapahoe County Water and Wastewater Authority
General Contractor: Glacier Construction Co. Inc.
Architect: Short and Brennan Architects
Engineers: Richard P. Arber Associates Inc., J.F. Sato & Associates, The RMH Group, Russ Sasakura Engineering, Mulhern MRE Inc.
Among the Subcontractors: Big R Construction Co., Ammex Masonry Inc., Guarantee Electric, Horizon Sheet Metal Inc.
Start: June 2006 Finish: April 2009

This project consists of the new construction of a 3.6-mgd biological nutrient removal facility and advanced water treatment reuse facility.

Related Links:
  • Top Colorado Projects of 2009
  • Streets at SouthGlenn
  • Overall Top 40 Projects
  • Commercial
  • K-12
  • Higher Education
  • Government/Recreation Facilities
  • Health Care/Assisted Living
  • Hospitality/Resorts
  • Industrial/Manufacturing
  • Infrastructure/Sitework
  • Mixed-Use
  • Multifamily
  • New Projects of 2009
  • 2. Rifle Regional Wastewater Reclamation Facility
    Rifle, Co
    $26.5 million
    Owner: City of Rifle
    General Contractor: Stanek Constructors
    Architect: JCA Architects
    Engineers: SGM Engineering Inc.
    Among the Subcontractors: Sturgeon Electric, Browns Hill Controls
    Start: Jan. 2008 Finish: Sept. 2009

    This project consists of the fast-track design and new construction of a 2.0-mgd wastewater reclamation facility.

    3. Foothills Water Treatment Plant
    Denver
    $24.3 million
    Owner: Board of Water Commissioners, Denver Water
    General Contractor: Garney Cos. Inc.
    Engineers: Baste Engineering, CH2M Hill
    Among the Subcontractors: Ludvik Electric, Big R Construction, Bemas Construction
    Start: Dec. 2006 Finish: March 2009

    This project includes new 100-mgd chlorine contact basins and new chemical systems as well as modifications to existing plant facilities and site improvements.

    advertisement
    4. Town of Eagle Wastewater
    Treatment Plant Expansion
    Eagle
    $14 million
    Owner: Town of Eagle
    General Contractor: Weaver General Construction Co.
    Architect: Short and Brennan Architects
    Engineers: Richard P. Arber Associates, SM&RC Structural Engineers Inc., Russ Sasakura Engineering Inc.
    Among the Subcontractors: Martinez Western Constructors, ASCO Masonry, Temcor, Action Air, Inc., Absolute Plumbing, Sturgeon Electric Co., Utility Control & Equipment
    Start: July 2007 Finish: June 2009

    This project includes a 1.65-mgd expansion of a conventional activated-sludge wastewater treatment plant, including new headworks facilities, new secondary clarifier, new UV disinfection facilities, new solids handling facilities, and modifications to existing secondary treatment facilities.

    5. Canal Importation Ponds & Outfall
    Drainage Improvements Project
    Fort Collins
    $11.5 million
    Owner: City of Fort Collins
    General Contractor: Garney Cos. Inc.
    Engineers: Anderson Consulting Engineers
    Among the Subcontractors: Schmidt Earth Builders, Lafarge, Belmire Sprinkler & Landscape
    Start: May 2008 Finish: Nov. 2009

    The Canal Importation Ponds and Outfall Project was developed following the city council’s 2001 adaptation of the Canal Importation Master Drainage Plan. The project encompasses a network of detention basins and storm sewers to address flooding and water quality problems in west central Fort Collins.

     

    Click here for past Features >>

     



     


    Sponsors

    © 2009 The McGraw-Hill Companies, Inc.
    All Rights Reserved